FLUXO signs a contract to renovate the arms of the North Pier of TASSE
This month of May, FLUXO signed a contract with Petrobras for technical services to recondition the FMC loading arms (TechnipEnergies), which will be installed on the North Pier of the São Sebastião Waterway Terminal (TASSE).
The scope of the contract involves the maintenance of eight loading arms and all their essential accessories, such as: HPU, electrical panels, manifolds, accumulators, among others.
The services will be carried out in their entirety by FLUXO with technical supervision in the field by FMC (TechnipEnergies), and include total disassembly of the arms, repair and replacement of spare parts, reassembly, paint repair, commissioning and operational tests.
At the end of the activities, all loading arms and their accessories will be delivered fully operational to Petrobras, to be installed on the North Pier, after a renovation process.
In 2017, Fluxo carried out the PMI (Preventive Maintenance Inspection) on these same pieces of equipment, generating a complete functional report, which served as the basis for the execution and implementation of this new reconditioning contract.
The partnership between Fluxo and Petrobras demonstrates the commitment of these companies to excellence in service provision and the guarantee of the safe operation of structures that are so vital to the operation of the São Sebastião Waterway Terminal, such as its loading arms.